Verge side collection of green waste is undertaken twice a year in the residential areas of Boyanup, Capel, Dalyellup and Peppermint Grove Beach.
For more information on Green Waste Collection check the website HERE
The RESTRICTED Burning Period for the whole of the Shire of Capel remains and has been extended from 6 May to 12 May 2024 (inclusive).
Any burning will require a permit from the local Fire Control Officer. Details are available on our website Here
Published on Friday, 5 April 2024 at 1:11:40 PM
TITLE
DEVELOPMENT ASSESSMENT PANEL DEVELOPMENT APPLICATION
PA56/2024
INDUSTRY EXTRACTIVE
Applicant
MM Giacci
Address
Lot 287 South Western Highway Gwindinup
Submission close date
2 May 2023
Proposal description
The Shire has received an application seeking approval for the use of gravel and sand extraction at the above lot. The development involves the following:
· 15.31ha extraction (extension) to existing operations with a total extraction are of 32.58ha;
· Total of 19 stages ranging in size from 0.9ha to 2ha;
· Vehicular access will be from the existing crossover from Lowrie Road;
· Maximum of 75 haulage (return – total 150) trips per day;
· Removal of 9.7ha of remnant vegetation;
· Rehabilitation to include a mix of remnant vegetation (3.14ha) and pasture (29.45ha);
· Proposed extraction timeframe of 10 years.
View the Full report HERE
Back to All News