Development applicaiton Elgin Road

Public comment

Lot 230 Elgin Road

The development involves:

  • extraction of approximately 197,000m3 of sand from the southern portion of the lot
  • sand to be extracted by a front-end loader in 5 stages
  • each stage to be between 1.3ha and 2ha
  • proposed duration of extraction is 5 year
  • batter slopes of 1:6
  • vehicular access from Elgin Road to Railway Road
  • the floor of the pit will be minimum 0.5m above the highest historical groundwater level
  • rehabilitation to pasture.

Share your feedback

It’s easy to share your thoughts and feedback.

  1. complete our online form
  2. email us at info@capel.wa.gov.au
  3. send mail to Shire of Capel PO Box 369 Capel.

Submissions close 15 April 2021

Submission form

    Your details



    Your submission


    File upload


    Need help?

    Speak with someone from the team today.